In most renovations the flooring goes in near the end, once the plastering, wiring, plumbing and other messy work is finished. The planning should start much earlier, though. Talk to us while the builders are still on site, so the measure, any preparation and the fitting date all fit your timetable.
Talk to us at the start, not the end
Spring is when a lot of projects get going: a new kitchen, a loft, an extension, or simply a house that needs everything doing. It is tempting to leave the floors until last because they go down last. But the floor you choose can affect other things, such as door heights, the thresholds between rooms and how the subfloor needs preparing.
A free private design consultation with Russell in the showroom is the easiest place to start. Bring the plans, a few photos and rough sizes. If you would rather see samples at home, we can visit you with them. If several rooms are changing at once, our guide to planning a room by room refresh helps you decide which floor goes where.
Measure once the walls are finished
We measure when the rooms are close to their final shape. If a wall is coming down, a chimney breast is going or an extension is being added, the sizes will change, and so will the quote. Measuring after plastering gives you an accurate written quote that will still be right on fitting day.
Measuring is free. It is also when we look at the floor itself, so we can tell you early whether you need ply, hardboard or screed. Our post on preparing uneven floorboards explains what each one is for.
The floor at the top of this page went into a new extension in Southgate, N14: Amtico Spacia New England Oak in a wide plank, laid straight so the whole room reads as one (Ref 13437). Floors like this go in once the building work is done and the room has its final shape.
Where the floors sit in the order of work
Every project is different, but a sensible order looks something like this:
- The heavy and dusty work: building, plastering, first fix wiring and plumbing.
- Kitchens and bathrooms, with the subfloor planned for the floor that goes in there.
- Decorating, including skirting boards and doors.
- Hard floors such as Amtico, Karndean, wood and laminate.
- Carpets and stair runners, so the new pile is not walked on by every trade.
If you are having Amtico or Karndean in a kitchen or bathroom, tell us early. These floors need a very flat, smooth base, and the screed or ply needs to be part of the plan, not squeezed in at the end. Thinking about underfloor heating? Amtico works well over it, with a maximum floor temperature of 27°C and a high temperature adhesive. There is more in can you put Amtico on underfloor heating.
Clear the old floor first
Ideally the old flooring comes up before the fitters arrive. It avoids a lot of dust on the day and lets us check whether the subfloor needs extra work. If you would rather not do it, we offer uplift and disposal for a small extra charge.
On the carpet job below, the old flooring was lifted, the subfloor prepared, and new underlay and gripper fitted before the carpet went down, with threshold strips at the doorways.
Penthouse Stateside in Atlanta, fitted after the old flooring was lifted and the subfloor prepared. See the job, Ref 13566
Wood look in the hall, stone look in the kitchen and utility. Amtico in Enfield, EN1. See the job, Ref 13304
Pipes, cables and doors
Tell us if there are pipes or cables under the floor that could be damaged if we nail into it. On concrete we can secure gripper rods and door thresholds with adhesive instead.
A new floor can sit a little higher than the old one, so doors may catch. Doors often need trimming after a new floor goes down, and we can organise it. Read more in doors catching on your new carpet.
Fitting day: access and parking
The goods are bulky and heavy, so we need to unload as close to your home as possible. If you live on a permit street, please arrange a parking space or a visitor permit before the day.
Clear the rooms of valuables, breakables and small items, and take pictures off the walls. Our fitters will help with larger furniture such as sofas and sideboards, as long as they are empty. If there is a lot of furniture a small charge may apply, and we always tell you first. Our guide to moving furniture for new flooring has the details. If you are living elsewhere during the work, our key-holding service means we can let ourselves in, fit the floor and put everything back.
Order the runner in good time
If the project ends with the stairs, order the runner early. Allow three to four weeks from order to fitting, and if your stairs turn there is an extra visit to template the turn first. Ordering while the decorators are still in means the runner can go down as soon as the paint is dry.
Two rooms, the landings and a runner in one go. Alternative Flooring Anywhere Sisal in London N8. See the job, Ref 13512
Book a free design consultation
Planning a spring renovation? Book a free private design consultation with Russell at 774 Green Lanes, Winchmore Hill, and bring your plans. We will help you choose the floors, measure for free when the time is right and fit around your builders. Book online or call 020 8360 1836.