If you want a stair runner before Christmas, start now. A runner takes three to four weeks from order to fitting, and if your stairs turn we need to template them before the runner is made. Book your design consultation in October and you give yourself time to choose properly, without a December scramble.
The stairs are the first thing guests see when they come through the front door. Here is how to plan a new runner so it is down and settled before they arrive.
Count back from Christmas Day
Christmas Day 2026 falls on a Friday. Work backwards from there:
- Fitting: you will want the runner down before the last busy week, not on Christmas Eve.
- Making: allow three to four weeks from order to fitting while your runner is cut and made.
- Templating: if your stairs turn, add an extra visit before the runner can be made.
- Choosing, measuring and quoting: this all happens before the order is placed.
Put that together and the order needs to go in by the third week of November at the very latest. That is cutting it fine. The three to four weeks only start once you have chosen, we have measured and you have accepted your written quote, so the sooner you begin, the more breathing room you have. Our guide to how long a stair runner takes explains each stage.
Step 1: Book a consultation in October
Start with a free, private design consultation with Russell in the showroom. Bring a few photos of your hall, stairs and landing, and the colours you are living with. Russell will lay samples side by side so you can compare designs, edges and rod finishes in one sitting. What happens at a design consultation tells you what to expect.
If it is easier, we can visit you at home with samples instead. It is a good way to see a runner in your own light, which matters in a hall that gets little daylight in winter.
Brockway Portofino Stripe in Nero, fitted across two flights of stairs in N21. See the job, Ref 13598
Step 2: Measure, template and quote
Once you have a favourite, we measure your stairs. The measure is free. On a straight flight, that is usually all we need before your written quote.
If your stairs turn, the runner has to be made to the exact shape of the winders, so we come out to template them first. That extra visit costs £150 to £300 depending on the turn. It is worth booking as soon as you have chosen, because it has to happen before the runner goes into production. Our post on runners on winders and turning stairs explains why.
Step 3: Order, then three to four weeks
When you accept the quote, we order your runner and it is cut and made to your stairs, with the edge you chose. Allow three to four weeks from order to fitting.
While you wait, get the house ready. Lift the old stair carpet if you can, or ask about our uplift and disposal service for a small extra charge. Our guide to stair runner fitting day has a short checklist for the day itself.
Penthouse Carpets Snowdon, an 80/20 wool twist, cut and made into a runner in NW11. See the job, Ref 13584
What it costs
These are Russell’s own guide prices:
| What | Guide price |
|---|---|
| 13 straight stairs, whipped edge | £1,000 to £2,000 |
| 13 straight stairs, taped edge | £1,300 to £2,300 |
| Extra visit to template a turn | £150 to £300 |
| Stair rods | £15 to £60 each, plus fitting |
The runner prices include the runner, underlay, grippers and fitting. We confirm everything in your written quote. If you have a written quotation for the identical runner from another local shop, our Price Match Guarantee means we will match or beat it. There is more in how much does a stair runner cost?
Choosing quickly, without rushing
A deadline is no reason to choose something you will tire of. A few pointers help you decide faster:
- Pick the edge early. A whipped edge blends in, a taped edge frames the runner in a contrast colour. See whipped edge or taped edge?
- Decide on rods. They are decorative, not structural, so they are a choice of look. Stair rods explained sets out the options.
- Think about wear. Choose a low, tight pile or weave. Anything thick or soft wears early on the nosing.
- Look at real stairs. Our stair runner projects of 2025 are full of ideas.
Roger Oates Dartmouth Green on a painted staircase in N21. See the job, Ref 13514
The rest of the house
If you are also thinking about carpets or Amtico elsewhere before Christmas, last year’s post on new floors before Christmas covers the bigger picture. Carpets and Amtico depend on stock and preparation, so ask us about timings for those. And once the runner is down, hosting at Christmas has tips for spills and muddy boots.
Book your consultation now
Our showroom at 774 Green Lanes, Winchmore Hill, N21 is open Monday to Saturday from 10am to 4pm, and 10am to 2pm on Wednesdays. Sunday we are closed. Visits by appointment are welcome, and they mean Russell can give you his full attention. Book a consultation or call us on 020 8360 1836.





