Your old carpet or floor has to come up before the new one goes down, and it is best done before the fitters arrive. You can lift it yourself, or we can lift it and take it away for a small extra charge. Either way, the aim is an empty room on fitting day, so our fitters can check the subfloor and start work straight away.
Why the old floor should come up first
Dust. Old carpet and underlay hold years of dust and grit, much of it trapped underneath where the vacuum never reached. Lifting it stirs all of that up. Better that happens before the new carpet is in the room, not while it is being laid.
The subfloor. Until the old floor is up, nobody can see what is underneath. Once it is gone, we can check the floorboards or concrete for loose boards, squeaks, old nails, damp patches or dips. Finding those before fitting day means they can be put right properly, rather than discovered with the new roll waiting in the hall.
Time. On fitting day our fitters want to spend their time on the new floor: preparing the subfloor, laying the underlay and gripper, and fitting the carpet neatly to every edge. A room that is already cleared lets them do that.
Lifting it yourself
Plenty of people lift their own carpet, and it saves the charge. A few tips:
- Wear gloves and knee pads. Old gripper has sharp pins.
- Cut the carpet and underlay into strips you can roll and carry.
- Pull out any staples left from the old underlay.
- Ask us before you take up the gripper. We will check it on the day.
- Do not attempt glued-down floors or old tiles without talking to us first. They can damage the subfloor if they are lifted the wrong way.
Then you need to get rid of it. Old carpet is bulky, and it will not go in the household bin. Check what your local council’s recycling centre will take before you load the car.
Letting us do it: uplift and disposal
If you would rather not, we offer uplift and disposal for a small extra charge. Our fitters lift the old carpet, underlay and gripper and take it all away. Old hard floors can come up too, but some take more work than others, so ask us. Mention it when you book, so it is in your written quote and the team comes ready for it.
On one North London job, the homeowners chose Penthouse Carpets Stateside in Atlanta, an 80/20 wool twist in a 50oz quality. Our fitters removed the old flooring first, prepared the subfloor, then fitted new underlay and gripper before the carpet went down, with threshold strips at the doorways. The living room in our main photo is the result (Ref 13566).
Hard floors can be a bigger job. On an Amtico job in North London, the work started with removing the old floor. Then came a screed, a damp-proof membrane and a final screed, and only then the new Amtico Spacia planks. We explained that in what is screed?.
The old floor up and the subfloor cleaned, ready for screeding before Amtico Spacia Mirrus Cotton went down, in North London. See the job, Ref 12491
When the subfloor needs work
Lifting the old floor sometimes shows that the subfloor needs attention. That is not bad news. It is the best time to find out. Uneven or worn floorboards can be covered with plywood, with the joints filled and sanded smooth, before Amtico or Karndean. Concrete can be screeded. For carpet, loose boards are fixed down so they do not creak under the new carpet. We cover this in preparing uneven floorboards. Any extra work is explained to you before it goes ahead.
Moving furniture and key holding
The other half of clearing a room is the furniture. If you can empty the room yourself, that is simplest. Our guide do I need to move my furniture? explains what to move and what we can help with.
If you would rather not deal with any of it, our key-holding service covers the lot, at extra cost. We move the furniture, lift the old floor, fit the new one, clean up and put everything back. With the school holidays here, it is a popular choice for families going away. You hand us the keys and come home to a finished floor. We described how it works in new floors while you’re on holiday.
On one Amtico job, the team moved all the furniture out, laid Amtico Spacia Honey Oak small parquet in herringbone, then returned everything to its place.
Amtico Spacia Honey Oak small parquet in herringbone, with the furniture moved out and put back by our team, in North London. See the job, Ref 13439
Planning a bigger project
If the flooring is part of a wider renovation, plan the removal into the order of works. Ideally the old floor comes up before the room is decorated, so the dust from lifting it does not settle on fresh paint. Our guide to spring renovations covers the order of work, and it applies just as well in summer.
Book a design consultation with Russell
Tell us at the start whether you want us to lift and take away the old floor, and whether you need furniture moved. Book a free design consultation with Russell in the showroom at 774 Green Lanes, Winchmore Hill, or call us on 020 8360 1836. Measuring is free, and your written quote will show every part of the job. Book online.





